Add to favorites

#COMMERCIAL ARCHITECTURE PROJECTS

Office Building Oskar

In 2018, A/W redesigned all the public areas at Siemens Headquarters, originally built in 1999 by Richard Meier.

The round, 8-metre-high entrance hall now serves as a reception and lobby. The reception desk made of solid Italian Carrara marble and a blue-and-grey-coloured carpet are positioned in the centre of the lobby. Directly above and framed by floor-to-ceiling curtains is a light installation almost 10 metres in diameter with 1,200 stainless-steel interactive LED rods from the design agency Fantomas.

Office Building Oskar

Details

  • Munich, Germany
  • Arnold / Werner

    Keywords